May. 7 at 8:32 AM
$FNICF
$FNI $FNICF SUMMER 2026 DRILL WATCH
April 7 PR confirmed a brand-new magmatic Ni-Cu-Co sulphide discovery 500 metres ENE of the historic Gochager Lake deposit. More importantly, the BHEM survey identified the single strongest off-hole conductor ever recorded at the project -- sitting 1.6 km ENE of the known deposit.
This is geologically significant. BHEM conductors in magmatic sulphide systems proxy for conductive sulphide mineralisation. When the best conductor is 1.6 km away from the known resource, it means the system is bigger than the drill program has tested. That is what the summer phase is designed to resolve.
Phase 2 summer drilling launches early June 2026. Assays from 2,143m of winter drilling expected mid-June. Company is FULLY FUNDED (C
$4M closed Feb 2026 with Crescat Capital as strategic participant).
Eight-plus km geochemical footprint. Former Noront Resources CEO Alan Coutts on the Board.